I want to talk to you today about tolerance. I am not talking about a workmate who has halitosis or a relative with questionable personal habits. I am talking about construction tolerances.

Anyone who has talked to a builder on site will have heard the phrase – ‘But mate! You have to allow some sort of tolerance. This IS a construction site’.

Before the 2016 Building Code of Australia (BCA), you will not find any reference to this concept. It does appear in AS1428.1:2009 in very limited cases, mostly positional dimensions for sanitary fixtures and grabrails. It certainly does not appear in relation to doorway widths, circulation spaces, ramp gradients etc.

If the building industry is convinced tolerance exists, but regulators do not acknowledge it except for a few special circumstances, where is the common ground? It is quite simple – you have to make your own allowance.

If the minimum height of a handrail is to be 1000mm and you know your building skills are such that you can only achieve a 10mm tolerance, then you have to build the handrail to a design dimension of 1010mm. That way, it will comply even in the worst case of tolerances working against you.

For designers, there are a few classic tricks to assist the construction industry.

  • Don’t design ramps or walkways to minimum grades; use 1:15 for ramps and 1:21 for walkways.
  • Don’t dimension rooms to frame size. If you do, add enough to ensure that wall finishes are covered.
  • Don’t run handrails into balustrades. Handrails have a maximum height of 1000mm. Balustrades have a minimum height of 1000mm. Since there’s no middle ground for a tolerance, it’s best to separate them by some other design device.

Sign up to receive the latest updates, news and insights from Jensen Hughes!

Connect With Us

Get In Touch

Contact

More blog posts from Jensen Hughes

Understanding and Managing Conflicts of Interest in Building Surveying in Victoria

8 May 2025

Building surveyors in Victoria must act independently under the Code of Conduct to avoid conflicts of interest and uphold trust in the building approval process.

Are Your Wall and Ceiling Linings Actually Compliant? The Hidden Fire Safety Risks

30 Apr 2025

Misinterpreting NCC 2022 fire requirements for wall and ceiling linings can lead to unsafe buildings. Learn how to avoid non-compliance, ensure correct Group Number testing under AS 5637.1, and protect lives with fire performance data.

Performance Solutions for External Fire Spread: The Role of Radiant Heat Screens

16 Apr 2025

Explore how radiant heat screens reduce fire spread and how Jensen Hughes supports their use in performance-based fire safety design solutions.